Network Library Phase 0 Implementation Tasks
This document outlines the specific tasks that need to be completed to implement Phase 0 of the network library. After completing this planning phase, we'll switch to Code mode to execute these tasks.
Implementation Tasks
1. Utils Directory and Event System Integration
- Create
libs/network/src/utilsdirectory - Implement
event-constants.tswith NetworkEvents enum - Implement
network-event-emitter.tsthat wraps @suaveplan/events - Create
index.tsfor exporting all utils
2. Update Types with Event Support
- Add IEventEmitter interface
- Add INetworkEventEmitter interface
- Update NodeState enum if needed
- Add APIVersion interface
3. Plugin System Infrastructure
- Implement
plugin-registry.tsfor plugin management - Create related plugin interfaces and types
- Set up plugin lifecycle hooks
4. Versioning Infrastructure
- Create
versioningdirectory - Implement
version-info.tsfor semantic versioning - Implement
version-manager.tsfor compatibility checking - Create index file for versioning exports
5. Update NetworkNode Implementation
- Complete constructor with event emitter integration
- Implement all getter methods
- Add node relationship management methods
- Implement connection management
- Add plugin registration support
- Integrate event system throughout methods
6. Update NetworkSystem Implementation
- Integrate event system in constructor
- Implement node creation and management
- Add hierarchy placement logic
- Add plugin registration support
- Implement versioning support
7. Update Main Index File
- Export all main components
- Set up logical organization of exports
8. Testing Infrastructure
- Create test files for all components
- Implement unit tests for each class
- Add integration tests for cross-component functionality
- Test event propagation through the system
File Structure after Completion
libs/network/src/
├── utils/
│ ├── index.ts
│ ├── event-constants.ts
│ └── network-event-emitter.ts
├── versioning/
│ ├── index.ts
│ ├── version-info.ts
│ └── version-manager.ts
├── node/
│ ├── index.ts
│ ├── node.ts
│ └── types.ts
├── network/
│ ├── index.ts
│ └── network.ts
├── plugins/
│ ├── index.ts
│ └── plugin-registry.ts
├── index.ts
└── types.ts
Next Steps
After completing this architectural planning, we'll:
- Switch to Code mode to implement the actual code
- Follow the task list systematically
- Test each component as we build it
- Ensure all components work together properly
Once Phase 0 is complete, we can proceed to Phase 1 as outlined in the main implementation plan.